Interconnection Guidelines – An outline of the entire process and information needed to successfully install solar equipment at home and connect a distributed generation system.

Rate policy for customer-owned generation
Schedule for purchase of excess distributed generation
 
Connecting Your System

All interconnection applications must be submitted online through PowerClerk.
Before you start, please have:

  • A system diagram (showing your equipment, meters, and disconnect switch if required)

  • A site plan (showing equipment locations and your system’s address)

  • Proof of insurance

  • Equipment certification or compliance documents

  • Manufacturer specification sheets

Visit PowerClerk today to begin your application